Giải giúp mình với ạ BLOCKED DRAINS SHUT GALLERY LINK A multimillion pound underground tunnel connecting two of Edinburgh's art galleries (close) 1._____ for two weeks so that blocked drains which have dogged the building from the outset can be fixed. The repair work (estimate)2.____to cast around £100,000 but it is unclear' who will foot the bill. Major losses (expect)3.____at the museum and at the gallery restaurant, which (house)4.___in the link and (force)5.____to shut whilst the work (carry out)6.____.The head of buildings said it was likely that the fault had occurred while the tunnel (construct)7.______"Tt probably happened while it (build)8.____ because we have had blockage problems since it opened. We (tell)9.______ it will cost around £100,000 - who will pay for it will be the issue". A spokeswoman for the National Galleries said: "Everything (do)10.____to ensure minimal disruption to visitors. Many of the educational workshops and events

Các câu hỏi liên quan